• Heritage Glazing at a Landmark Distillery – Swansea

    Heritage Glazing at a Landmark Distillery

    Specialist glazing within a Grade II-listed site, combining modern performance with the character of a historic building.

  • Restoring a Home After a Break-In

    Restoring a Home After a Break-In

    Restoring a home after a break-in, from emergency make-safe through to bespoke door and glazing replacement.

  • Riverside Care Home – Phased Window & Door Upgrades

    Riverside Care Home – Phased Window & Door Upgrades

    Upgrading windows and doors across an occupied care home with a resident-first approach to safety and comfort.

  • Network Rail Offices – Water Ingress Remediation

    Network Rail Offices – Water Ingress Remediation

    Resolving persistent water ingress across seven rooflights using specialist access and targeted repairs.

  • County Hall, Norwich – Window & Door Upgrade

    County Hall, Norwich – Window & Door Upgrade

    Replacing ageing windows and doors across a major municipal building to improve thermal performance and comfort.

  • Glazed Atrium Renewal at Pharmaceutical Headquarters

    Glazed Atrium Renewal at Pharmaceutical Headquarters

    Renewing a five-storey glazed atrium to improve thermal performance and environmental control.

  • Commercial window replacement installed to a modern office building

    Woolmer Hill, Surrey

    Upgrading a Surrey secondary school with new modern aluminium glazing during the school holidays.

  • New Street Square, London

    New Street Square, London

    Safely replacing 13 bonded glass units across multiple elevations at a live, central London site.

  • Glass Roof Panel at Icon Media Centre

    Glass Roof Panel at Icon Media Centre

    Seamless 300kg roof glass replacement safely delivered above a live London media centre reception.

  • Wimborne – French Door Replacement

    Wimborne – French Door Replacement

    Evander was instructed to attend a property in Wimborne following issues identified with the installation of a set of French doors. The original doors had been incorrectly fitted to open inward, creating operational difficulties and restricting the resident’s usable space.

  • Crawley – Door & Window Remedial Works

    Crawley – Door & Window Remedial Works

    Evander was instructed to visit a residential property in Crawley to investigate concerns around the installation quality of several PVC windows and the main entrance door. Our inspection highlighted a number of issues caused by the original fitting, requiring remedial works to bring the property back up to the required standard.

  • Clacton-on-Sea – French Door Replacement

    Clacton-on-Sea – French Door Replacement

    Evander was instructed to attend a property in Clacton-on-Sea after concerns were raised about a set of rear French doors that were letting draughts and cold air into the home. A full inspection was carried out to identify the cause and determine the most effective solution.

  • Brighton – Aluminium French Door Replacement

    Brighton – Aluminium French Door Replacement

    Evander was instructed to attend a property in Brighton to assess a set of aluminium French doors that opened directly onto a balcony. The resident had reported concerns around their condition and water ingress, prompting a full inspection to determine the most appropriate solution.

  • Alfreton – Garage Door Replacement

    Alfreton – Garage Door Replacement

    Evander was instructed to attend a property in Alfreton after the resident reported issues with the operation of their garage door. The door had become difficult to use safely, prompting a full inspection to assess the extent of the damage.

  • Pulse Testing, Windows and PIV Installation in Dunston, Gateshead

    Evander reduced internal noise for a customer near the A1 using acoustic glazing and PIV.

  • High Street Bank in Streatham, London

    Find out about how Evander responded to urgent glazing damage at a high street bank in London.

  • Care Home, Stanmore

    Find out how Evander supported a client with repairs at a 72-bed care home in Stanmore, London.