The Brief
We were appointed to deliver a programme of up to 13 bonded double-glazed unit (DGU) replacements at a live, high-profile central London site.
The damaged glazing was located across multiple elevations, each requiring a tailored access solution. A combination of rope access, bespoke scaffolding, MEWPs, spider cranes and specialist glass lifting equipment was needed to complete the works safely.
All units were bonded, meaning each replacement followed a two-stage process: safe removal, temporary weatherproofing, off-site re-bonding and final reinstatement.
Weekend-only access restrictions, a busy city-centre location and limited as-built information added further complexity, requiring detailed investigation and flexible programming.

The Outcome
All 13 bonded glazing units were replaced within programme.
Positive feedback was received from the site team. Despite weekend-only access and varied constraints, the works were delivered safely, efficiently, and without disruption to operations.
The project demonstrates our ability to deliver complex glazing replacement works in live commercial environments through technical expertise and flexible planning.
Our Solution
We developed a collaborative, flexible delivery strategy designed around access constraints and operational limitations, including:
At a Glance
Project Overview
Just want to say thank you for your assistance and professionalism getting this project over the line. Really appreciated.
Dino Aloneftis, Small Works Manager, Deloitte LLP
More Case Studies
Clacton-on-Sea – French Door Replacement
Evander was instructed to attend a property in Clacton-on-Sea after concerns were raised about a set of rear French doors that were letting draughts and cold air into the home. A full inspection was carried out to identify the cause and determine the most effective solution.
Crawley – Door & Window Remedial Works
Evander was instructed to visit a residential property in Crawley to investigate concerns around the installation quality of several PVC windows and the main entrance door. Our inspection highlighted a number of issues caused by the original fitting, requiring remedial works to bring the property back up to the required standard.