The Issue / Problem

Lidl required a specialist glazing solution involving the temporary removal and reinstatement of curtain walling at two London stores to facilitate the installation of large commercial refrigeration units.

The existing curtain wall systems needed to be removed with precision to avoid damage to the façade and internal finishes. Works were located on busy High Streets, requiring careful coordination around public access, pedestrian safety, and local noise curfews.

Due to store trading commitments, all works had to be completed outside of operational hours. The size, weight and positioning of the glazing also required controlled lifting operations and specialist handling to ensure safety and accuracy.

Lidl Stores, London

The Outcome

The façade sections were removed and reinstated seamlessly, with zero disruption to store trading. The precision of the temporary removals allowed the refrigeration installation works to proceed safely, efficiently and exactly to programme.

Carefully structured out-of-hours planning eliminated operational downtime and ensured full business continuity throughout the project. Every stage was delivered with meticulous control – from specialist lifting operations to detailed access coordination, guaranteeing the curtain wall systems were reinstated to their original integrity.

The result was a technically precise, safely executed solution that protected the existing façade while meeting all operational and commercial requirements.

Our Solution

We delivered a fully controlled removal and reinstatement programme tailored to Lidl’s operational requirements, including:

  • Temporary removal and reinstatement of curtain walling over two planned visits per store

  • Close coordination with store teams to allow refrigeration units to be installed between removal and reinstatement phases

  • Full on-site logistics management including delivery scheduling, sequencing of works, and controlled access arrangements

  • Out-of-hours working to ensure no disruption to store trading

At a Glance

Overcoming Challenges

  • Careful labelling, protection and storage of glazing components to maintain façade integrity

  • Use of specialist lifting equipment to minimise manual handling risks and ensure precise glass movement

  • Strict adherence to agreed timeframes to guarantee stores reopened fully operational

  • Detailed planning around busy High Street environments to maintain public safety

Just want to say a massive thank you for the excellent work ethic and smooth project completion at 1670 Ilford. The project was a great success thanks to your contribution!

Martyna Maria Kubiak, Store Maintenance Manager

For more information, expert advice, or a no-obligation quote, contact us or chat with us online

More Case Studies

  • Care Home, Stanmore

    Find out how Evander supported a client with repairs at a 72-bed care home in Stanmore, London.

  • High Street Bank in Streatham, London

    Find out about how Evander responded to urgent glazing damage at a high street bank in London.

  • Pulse Testing, Windows and PIV Installation in Dunston, Gateshead

    Evander reduced internal noise for a customer near the A1 using acoustic glazing and PIV.

  • Care Home, Stanmore

    Find out how Evander supported a client with repairs at a 72-bed care home in Stanmore, London.

  • High Street Bank in Streatham, London

    Find out about how Evander responded to urgent glazing damage at a high street bank in London.